We didn't manage to move last weekend since most of the work has not been completed. Manage to get one week extension from our landlord, so that means we'll need to move by this weekend.
Benchtop being installed by Maslate from Nunawading. Did a decent job in my opinion.
Meanwhile the main contractor has been doing a really good job with the interior painting. Care has been taken to ensure the completed floor is not scratched
Benchtop being installed by Maslate from Nunawading. Did a decent job in my opinion.
Benchtop was cut to size in factory |
Substrate installed to accommodate 40mm edge |
Waterfall on edges to avoid kids running onto edges |
Extra large sink for E |
Cavity for integrated dishwasher |
Completed hallway. Doors next |
Painting living room |
Doors prep for final coat |
More doors.. 17 in total! |
You done great job for renovate kitchen with amazing Kitchen benchtop.
ReplyDeleteKitchen Benchtops Melbourne